Fire escape - Eastbourne Hotel
The steel fire escape was a direct replacement. Fabricated at our works and then installed at the rear of a leading Eastbourne hotel. The structure was galvanised then installed to fit within a time scale created by the customer and ourselves to produce a safe and uncomplicated installation.
|
|
Hand Rails - East Sussex Council
The hand rails and staircase were made from stainless steel and fabricated at our works then installed at the offices of East Sussex Council.
|
|
Clock Tower - North Shields
The clock tower was fabricated at our works and then transported by a local haulage company to North Shields where it was installed outside a shopping centre.
|
|
Lighting Posts- Wellingborough
The lighting posts were constructed from aluminium and powder coated in dark blue. They were then installed in a shopping centre in Wellingborough. The lighting was wired into the existing supply.
|
|
Loading Dock - ADM Eastbourne
The loading dock was fabricated in steel channels and constructed to an engineering drawing supplied by the customer. The entire construction was assembled at our works then transported and installed as a single finished construction. Complete with hydraulics, food safe, cladded walling and entry curtains with the addition of electrical distribution for working components.
|
|